How to switch the order of Construction Stages?
Answer:

This can't be done directly in the GUI.
If required, this can be done using the mct command shell. Kindly refer to the steps in the image below.
Files | ||
---|---|---|
DataImage73.png 41.7 KB |
||
DataImage87.png 93.3 KB |